Aim:
To be able to operate the bilge, the ballast and the cargo pumping systems by pumping out bilge water from the engine room bilge aft, the bilge pipe duct, the cargo hold bilge No. 1, 2, 3 & 4, to the settling tank using the engine room bilge pump but not the bilge pumnp No. 1 and 2 and at the same time pumping out the settlling tank using the oily water seperator.